Skip to article
Bridge

Meetings for site reliability engineers: the production meeting

Site reliability engineers have one meeting built around the state of a service, not the status of a person. Google's Site Reliability Engineering book describes it in detail: the weekly production meeting. Google's SRE books also mention two related practices, the on-call handoff and regular postmortem review sessions. This page sets out what each is for and what it should leave behind.

Three recurring SRE practices

The production meeting is about the state of a service, not the status of a person. That shapes who attends and what gets written down. The handoff and the postmortem review sit beside it.

PracticeWhat it is forWhat it leaves behind
Production meetingEveryone who cares about a service leaves with the same idea of how it is runningMinutes and assigned action items
On-call handoffThe next engineer on call knows what happened on the last shiftA written handoff the next shift reads
Postmortem reviewA drafted postmortem is discussed, finished and sharedA reviewed postmortem in the team's repository of past incidents

The production meeting

Google's Site Reliability Engineering book describes the production meeting as the place where an SRE team states, to itself and its invitees, the state of the services in its charge.

The book says these meetings usually happen weekly and last 30 to 60 minutes. It offers a default agenda and says it is not appropriate to be prescriptive, so adapt the list to your service.

  • Upcoming production changes: start time, duration and expected effect.
  • Metrics: the core metrics of the service, such as latency and CPU utilization, and how they change over time.
  • Outages: problems of roughly postmortem size.
  • Paging events: the list of pages, who was paged and what happened. Ask whether each alert should have paged in the way it did, and whether it should have paged at all.
  • Nonpaging events: issues that should have paged, issues that need attention without a page, and alerts to remove.
  • Prior action items: each assigned to a person and tracked.

Who attends, and who chairs

The book says attendance is compulsory for every member of the SRE team, and that major stakeholders and partner product development teams should attend too.

Many SRE teams rotate the chair through team members. The book's reason is ownership: everyone gets a stake in the service, and everyone practices a skill they need when coordinating an incident.

  • For a less active service, one representative from the product team can attend, or the product team can commit to reading and commenting on the minutes.
  • When two SRE teams meet by video and one is much larger, the book recommends placing the chair on the smaller side of the call.
  • Keep a shared agenda document that anyone in engineering can open, and fill it in before the meeting with ideas, comments and information.

The on-call handoff

A handoff is how one shift tells the next what it needs to know. In the Site Reliability Workbook's on-call example, it is written.

The Site Reliability Workbook describes the on-call guidelines of one Google SRE team in Mountain View. Two of them cover the handoff:

  • At the start of each shift, the on-call engineer reads the handoff from the previous shift.
  • At the end of the shift, the on-call engineer sends a handoff email to the next engineer on call.

If you add a handoff call

If your team wants a short call at the change of shift, we suggest ending it with a written note anyway. The next shift may need to reread it at 3 a.m.

The workbook does say teammates should follow up with each other when a handoff does not meet expectations. Its examples are short and helpful, such as pointing to a related bug.

In the same chapter, Evernote describes a weekly, 24/7 rotation with a handoff procedure, alongside a morning review of incidents at a daily stand-up.

Postmortem review sessions

Running the postmortem meeting itself has its own page, linked below. What the SRE book adds for a team's calendar is the standing session: it encourages regular review sessions so that every completed draft is reviewed.

The book also describes two recurring formats that reuse old postmortems for learning:

  • Postmortem reading clubs: a team discusses an interesting or impactful postmortem, often one that is months or years old.
  • Wheel of Misfortune: engineers reenact a previous postmortem, playing the roles laid out in it.

Example: one week for a three-person rotation

This example is illustrative. It shows how these three could fit together for a small team that supports a payments API across two time zones. This team chose to hand off on a call.

DayMeetingOutput
MondayOn-call handoff, 15 minutes by videoHandoff note: two pages last week, one alert proposed for removal
WednesdayProduction meeting, 45 minutes, with the payments product teamMinutes, and three action items with owners
ThursdayPostmortem review of the previous week's outageComments closed, postmortem filed with past incidents

Where Bridge fits

Bridge can keep the record of these meetings so nobody has to act as scribe. You can host the meeting on Bridge, or capture a Zoom, Google Meet or Microsoft Teams call with an external agent that the host admits.

  • After the meeting, the Notes tab holds a summary, decisions and follow-ups, and the Conversation tab holds a speaker-labeled transcript you can search.
  • Notes include assigned action items when any were discussed, and you can edit who each one is assigned to.
  • Put each week's production meeting in one Space, so the team and its partner product teams can open past meetings in one place.
  • Export a transcript as a PDF, Word or Markdown file when a postmortem needs the exact words.

Limits to keep in mind

  • A transcript records what people said, not what the dashboards showed. Link graphs and incident timelines from your own tools.
  • Speaker labels and action item owners can be wrong. Check both before the notes become the record.
  • The SRE book describes Google's own practice, and it says it is not appropriate to be prescriptive about how to run a production meeting.
  • Postmortems can contain sensitive detail. The SRE book notes that Google's postmortems never include information that might identify an end user.

Sources & further reading